Also called: PT, internal tendons, external tendons, grouting of ducts
How it is done
- Install ducts (corrugated steel or plastic) to the profile with supports every metre and vents at high points; anchorages fixed to the forms.
- After concrete strength is reached, thread strands, stress with calibrated jacks to the design force, record force and elongation, and compare with calculated (within 5-7 %).
- Grout with a low-bleed, thixotropic grout from the low point until it emerges clean at every vent; vacuum-assisted grouting where required; seal anchorages with caps and protective concrete.
Where it fits
- All post-tensioned decks, pier caps, pylon anchorage zones, transverse deck PT.
Where it does not
- Grouting in freezing weather, grout with chloride or excessive bleed, leaving ducts ungrouted for weeks.
Plant, pace and money
PlantStrand pushers, jacks and pumps, grout mixers and pumps, vacuum unit.
ProductivityA tendon of 20 strands stressed in an hour; grouting a span in a day.
CostUSD 6-12 per kg of installed tendon.
Risks and controls
What goes wrong
- Grout voids (the Ynys-y-Gwas and Florida failures), strand corrosion at anchorages, duct damage during concreting, strand slip at stressing.
Quality assurance
Stressing records for every tendon, grout tests (fluidity, bleed, strength), vent inspection, anchorage sealing inspection; modern practice adds duct pressure tests before grouting.
Examples
All the game's PSC decks assume proper PT; the upkeep score penalises nothing here only because the game cannot see grout.
Related methods
Further reading
PTI/ASBI M50 Specification for Grouting · fib Bulletin 20 · EN 445-447