TheBridgeEng Preliminary tools

Bridge Budget Estimator

Bridge typePSC Beam
Site
Landbase rate
Sea / Water+ marine
Total length
m
20 m1,000 m

Total deck length end to end. Type a value or drag the slider.

Deck width
m
5 m50 m

Out-to-out deck width. Drives total area with length.

Deck area
12,500 m²
Unit rate
$1,800 /m²
$22.5 M
Expected budget
Low$15.8 M
High$31.5 M

Indicative only. Order-of-magnitude figures for comparing relative differences between bridge types and sizes — not exact values. Rates are world-average ranges (≈ $/m² of deck) and exclude site-specific foundations, approaches, utilities, land, and soft costs. Always verify against current local quotes.

Field notes — what to watch for

Treat the output as a bracket, not a number — real tenders swing with steel prices, site access and foundation surprises. The biggest early-stage cost lever is almost never the superstructure rate: it is span arrangement, because piers and foundations are where money hides.

Inputs are saved on this device · reset to defaults

TheBridgeEng · free reference for bridge engineers · preliminary use onlyhome · all tools · news · insight