Also called: work barge, spud barge, crane barge
How it is done
- Position with tugs, drop spuds or set anchors; deck the crane and the rig.
- Drive piles through a template fixed to the barge or to previously driven piles; adjust for tide.
- Move between piers in hours.
Where it fits
- Sheet-pile cofferdams, driven piles in rivers and sheltered water, pier construction in calm estuaries, service of jack-ups.
Where it does not
- Open sea, strong currents, bored piling that needs a fixed platform, tolerances tighter than the barge motion.
Plant, pace and money
PlantFlat-top barge 30-80 m, 100-300 t crawler crane, spuds, tugs.
ProductivityCheap to move, slow to hold position; downtime in weather.
CostUSD 5,000-25,000 per day.
Risks and controls
What goes wrong
- Capsizing under an over-swung crane, spud failure in current, collision, crew falls.
Quality assurance
Stability calculation for each crane radius, mooring plan, weather limits.
Examples
River pier cofferdams worldwide; the game's default access for water piers under 6 m.
Related methods
Further reading
USACE floating plant safety · IMCA marine guidance