TheBridgeEng · Learning from Failure

Vikramshila Setu, span near pier 133 (2026)

India · Material deterioration · 4.7 km bridge over the Ganga linking Bhagalpur and Naugachia, built by the Uttar Pradesh State Bridge Corporation and opened in 2001

In March 2026 protection walls around piers 17 to 19 collapsed, exposing the foundations to the current; expansion-joint gaps had reportedly opened to about 150 mm and heavy vehicles set the deck vibrating.…

Read the full case — mechanism, cause chain, code changes →

More Material deterioration cases

Zabali hanging bridge, Baler (2026) · NH-7 bridge over the Bhakra Main Line canal, Pasiana (Patiala–Sangrur bypass) (2026) · Pero's Bridge, Bristol Harbour (2026) · Bridge at km 5, Kornilovka–Shekleyevo road (мост на 5-м км дороги Корниловка – Шеклеево) (2026) · Lokaha Bridge, Mahendra Highway (2026) · Boritdol Bridge, Guryongpo (보릿돌교) (2026)

One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.