South Korea · Material deterioration · 225 m sea footbridge (170 m over the water, about 10 m high) linking the shore to the Boritdol reef; completed by Pohang City in December 2013 for 11.5 billion won
A precise safety inspection in 2024 graded the bridge C, and the deck and railings were reinforced in 2025.…
Read the full case — mechanism, cause chain, code changes →
Zabali hanging bridge, Baler (2026) · NH-7 bridge over the Bhakra Main Line canal, Pasiana (Patiala–Sangrur bypass) (2026) · Pero's Bridge, Bristol Harbour (2026) · Bridge at km 5, Kornilovka–Shekleyevo road (мост на 5-м км дороги Корниловка – Шеклеево) (2026) · Lokaha Bridge, Mahendra Highway (2026) · Penamaluru Bridge over the Bandar Canal (2026)