TheBridgeEng · Learning from Failure

Pero's Bridge, Bristol Harbour (2026)

United Kingdom · Material deterioration · Three-span lifting footbridge across St Augustine's Reach; the hydraulically raised centre span is balanced by two horn-shaped steel counterweights

Test lifts were made about every three months until 2016; after that, some 3 tonnes of love locks on the bridge stopped regular test lifts for about ten years.…

Read the full case — mechanism, cause chain, code changes →

More Material deterioration cases

Zabali hanging bridge, Baler (2026) · NH-7 bridge over the Bhakra Main Line canal, Pasiana (Patiala–Sangrur bypass) (2026) · Bridge at km 5, Kornilovka–Shekleyevo road (мост на 5-м км дороги Корниловка – Шеклеево) (2026) · Lokaha Bridge, Mahendra Highway (2026) · Boritdol Bridge, Guryongpo (보릿돌교) (2026) · Penamaluru Bridge over the Bandar Canal (2026)

One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.