United Kingdom · Material deterioration · Three-span lifting footbridge across St Augustine's Reach; the hydraulically raised centre span is balanced by two horn-shaped steel counterweights
Test lifts were made about every three months until 2016; after that, some 3 tonnes of love locks on the bridge stopped regular test lifts for about ten years.…
Read the full case — mechanism, cause chain, code changes →
Zabali hanging bridge, Baler (2026) · NH-7 bridge over the Bhakra Main Line canal, Pasiana (Patiala–Sangrur bypass) (2026) · Bridge at km 5, Kornilovka–Shekleyevo road (мост на 5-м км дороги Корниловка – Шеклеево) (2026) · Lokaha Bridge, Mahendra Highway (2026) · Boritdol Bridge, Guryongpo (보릿돌교) (2026) · Penamaluru Bridge over the Bandar Canal (2026)