TheBridgeEng · Learning from Failure
Nepal · Flood / debris · 41 of 63 road bridges from Rasuwagadhi to Muglin — Bailey, steel truss, RC and arch
Part of the Langtang Lirung glacier let go when the bedrock under it failed; rock and ice fell 1,200 m into the Lende Khola…
Read the full case — mechanism, cause chain, code changes →
FM 481 Nueces River Bridge (2026) · Sataso Bridge (Mampong–Ejura road) (2026) · Phú Thiện suspension footbridge (2025) · Hongqi Grand Bridge (红旗特大桥) (2025) · Mataian River Bridge (馬太鞍溪橋), Provincial Highway 9 (2025) · Khyber Pakhtunkhwa monsoon bridges (Buner, Swat, Swabi) (2025)
One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.