TheBridgeEng · Learning from Failure

Sataso Bridge (Mampong–Ejura road) (2026)

Ghana · Flood / debris · road bridge on the Kumasi–Mampong–Ejura–Yeji corridor, under reconstruction after a first washout on 19 May 2026

Heavy rain on 19 May 2026 washed the bridge out; the Ministry of Roads and Highways started reconstruction…

Read the full case — mechanism, cause chain, code changes →

More Flood / debris cases

Trishuli / Bhote Koshi valley bridges (Langtang Lirung glacier collapse) (2026) · FM 481 Nueces River Bridge (2026) · Phú Thiện suspension footbridge (2025) · Hongqi Grand Bridge (红旗特大桥) (2025) · Mataian River Bridge (馬太鞍溪橋), Provincial Highway 9 (2025) · Khyber Pakhtunkhwa monsoon bridges (Buner, Swat, Swabi) (2025)

One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.