Sataso Bridge (Mampong–Ejura road) (2026)

Ghana · Flood / debris · road bridge on the Kumasi–Mampong–Ejura–Yeji corridor, under reconstruction after a first washout on 19 May 2026

Heavy rain on 19 May 2026 washed the bridge out; the Ministry of Roads and Highways started reconstruction…

Read the full case — mechanism, cause chain, code changes →

More Flood / debris cases

Kampung Brooke Lama suspension bridge (Jambatan gantung Kampung Brooke Lama) (2026) · Talitay hanging bridge (2026) · Budhi Gandaki flood bridges (Arughat, Soti, Machhakhola–Kerauja and others) (2026) · Ban Had Ngio suspension bridge (สะพานแขวนบ้านหาดงิ้ว) (2026) · Trishuli / Bhote Koshi valley bridges (Langtang Lirung glacier collapse) (2026) · FM 481 Nueces River Bridge (2026)

One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.