TheBridgeEng · Learning from Failure
Philippines · Overload / crowd · steel tied-arch over the Cagayan
The new tied-arch crossing opened on 1 February 2025 with a posted load limit…
Read the full case — mechanism, cause chain, code changes →
Pongpet suspension footbridge (opening day) (2026) · Tulay ng Pangulo modular bridge, Camanga (2026) · Carroll Road Bridge (2025) · Piggatan Bridge (2025) · Kundmala (Indrayani) Bridge (2025) · Babb's Covered Bridge (2024)
One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.