TheBridgeEng · Learning from Failure

Tulay ng Pangulo modular bridge, Camanga (2026)

Philippines · Overload / crowd · prefabricated steel modular bridge of the Tulay ng Pangulo programme on a barangay road

A six-wheeler dump truck carrying about 16 m³ of gravel for a concreting job drove onto the bridge at 15:10…

Read the full case — mechanism, cause chain, code changes →

More Overload / crowd cases

Pongpet suspension footbridge (opening day) (2026) · Carroll Road Bridge (2025) · Piggatan Bridge (2025) · Kundmala (Indrayani) Bridge (2025) · Cabagan–Santa Maria Bridge (2025) · Babb's Covered Bridge (2024)

One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.