India · Overload / crowd · Decades-old road bridge over the Harang River on the Silchar–Kalain road (Assam–Meghalaya link); repaired 2023–2025 for Rs 1.37 crore; span type not reported
The bridge reopened in May 2025 after nearly two years of repair costing Rs 1.37 crore, while the nearby Gammon Bridge was closed.…