TheBridgeEng · Learning from Failure
Italy · Construction stage · New pedestrian and cycle footbridge built in segments over the Adda alongside the SP196 road bridge; about €4 million; length and span layout not reported
The footbridge was close to acceptance testing, and a final concrete pour had been placed in the days before.…
Read the full case — mechanism, cause chain, code changes →
Berakhal River bridge, Mohanpur (Hailakandi) (2026) · Hathli Khad truss span (Hamirpur bypass, NH-103) (2026) · Llewellyn Estes Bridge (Stillwater Ave, Old Town) (2026) · Pyeonggang-cheon Bridge girders (부산 에코델타시티) (2026) · Betwa River bridge (Hamirpur, UP) (2026) · Seosomun Overpass demolition (서소문고가차도) (2026)
One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.