TheBridgeEng · Learning from Failure
India · Construction stage · RCC girder bridge under construction (Rs 3.6 crore) on the Algapur–Katlicherra road
Residents had complained about the sand, reinforcement and shuttering used; the site engineer and the department ignored them (their account)…
Read the full case — mechanism, cause chain, code changes →
Hathli Khad truss span (Hamirpur bypass, NH-103) (2026) · Llewellyn Estes Bridge (Stillwater Ave, Old Town) (2026) · Pyeonggang-cheon Bridge girders (부산 에코델타시티) (2026) · Betwa River bridge (Hamirpur, UP) (2026) · Seosomun Overpass demolition (서소문고가차도) (2026) · Yuegang Bridge (月港大桥) (2026)
One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.