TheBridgeEng · Learning from Failure

Ghoghari river bridge (under construction), Sidhwalia (2026)

India · Construction stage · Small RCC bridge over the Ghoghari river built by the Rural Works Department for Rs 2.87 crore

On the evening of 28 February 2026 part of the bridge collapsed during casting.…

Read the full case — mechanism, cause chain, code changes →

More Construction stage cases

Berakhal River bridge, Mohanpur (Hailakandi) (2026) · Hathli Khad truss span (Hamirpur bypass, NH-103) (2026) · Llewellyn Estes Bridge (Stillwater Ave, Old Town) (2026) · Bakhtiyarpur–Tajpur Ganga bridge, pier P-38 (under construction) (2026) · Pyeonggang-cheon Bridge girders (부산 에코델타시티) (2026) · Betwa River bridge (Hamirpur, UP) (2026)

One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.