Mid-Bay Bridge (SR 293) (2019)

United States · PT corrosion · 5.8 km precast segmental box girder, 141 spans, post-tensioned tendons

The 1993 segmental bridge depends on post-tensioning tendons; two tendon failures had already been found during a routine inspection in 2000…

Read the full case — mechanism, cause chain, code changes →