Kerch railway bridge (Керченский железнодорожный мост) (1945)

Russia · Design error · 4.5 km temporary rail viaduct, about 115 spans of 27 m on pile piers, two swing spans

The crossing was built in roughly 150 days in 1944 to a lightened design reusing German materials, with ice breakwaters deferred to a second stage; only five were finished…

Read the full case — mechanism, cause chain, code changes →