TheBridgeEng · Learning from Failure
Vietnam · Vessel impact · steel truss rail bridge (2016 rebuild after the 2016 collapse)
A 3,339-tonne barge running downstream struck panel 5 of span 2 of the rebuilt bridge…
Read the full case — mechanism, cause chain, code changes →
Tacony–Palmyra Bridge ship strike (2026) · Bang Na–Trat Road footbridge, km 34 (2025) · Gabesstraße footbridge (2025) · Pelican Island Causeway (2024) · Francis Scott Key Bridge (2024) · Lixinsha Bridge (2024)
One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.