TheBridgeEng · Learning from Failure
United States · Design error · 6 deaths · PSC truss, ABC method
Node 11/12 cold-joint shear capacity grossly overestimated; interface unroughened…
Read the full case — mechanism, cause chain, code changes →
Tapiola temporary pedestrian bridge (2023) · Jeongja Bridge sidewalk (정자교) (2023) · Tretten Bridge (2022) · Luțca Bridge (2022) · Corpus Christi Harbor Bridge — near miss (2022) · West Seattle High Bridge — near miss (2020)
One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.