TheBridgeEng · Learning from Failure

Dodhara Chandani Bridge (दोधारा चाँदनी पुल) (2026)

Nepal · Scour · Multi-span pedestrian suspension bridge over the Mahakali River, 1,452.96 m, 12 spans (4 × 225.4 m and 8 × 70 m), steel pylons about 32.7 m high, wire-rope cables, 1.6 m steel grille deck

Days of heavy rain left the Mahakali running high and fast in late September 2026.…

Read the full case — mechanism, cause chain, code changes →

More Scour cases

Chapri Bridge, Kot Chandana Road (2026) · Palavaagu stream bridge, Rajupet (2026) · Agana and Aquino Bridges (Tarlac River) (2026) · Kothi–Koranar bridge (2026) · Ponte Padre Paolino Baldassari (Rio Iaco) (2026) · Callawa Bridge (2026)

One of 300 forensic bridge-failure case studies at TheBridgeEng — free, for engineers.